NEW QUESTION 123
Which two of the following are means in which radiated interference primarily enters electronic devices?
(Select two options.)

  • A. Input signal lines
  • B. Missing or inadequate device or cable shielding
  • C. Proximity to interfering sources
  • D. Interface designs
  • E. Missing or inadequate optical connections

Answer: B,C

 

NEW QUESTION 124
A program stakeholder is concerned about information they receive about a project. Who is responsible for reviewing the communications management plan to assure adequate information is provided to the stakeholder'?

  • A. Communications manager
  • B. Program sponsor
  • C. Program manager
  • D. Project manager

Answer: C

 

NEW QUESTION 125
After meeting with the program sponsor and stakeholders, the program manager is asked by the sponsor to accelerate the program to replace two legacy financial systems. The legacy systems are at risk of premature failure.
What should the program manager do next?

  • A. Create several "what-if" scenarios of alternatives to present to the program sponsor
  • B. Identify the parts of the program that need to be accelerated and. if it is cost effective and increases benefits realization, implement the change
  • C. Analyze the impact of accelerating the program, and present the pros and cons to the program sponsor
  • D. Accelerate the projects and components of the program that replace the two legacy systems

Answer: C

 

NEW QUESTION 126
In a design type Scope of Work (SoW) the ICT distribution designer is responsible for providing

  • A. a user needs analysis
  • B. specific products and materials
  • C. stakeholder requirements
  • D. a safety plan

Answer: B

 

NEW QUESTION 127
Which two of the following are ADVANTAGES of aerial pathways? (Select two options.)

  • A. Quick to install
  • B. Affect the aesthetic appearance of the property
  • C. Readily accessible for maintenance
  • D. Economical over a long life
  • E. Has a low initial installation cost

Answer: A,C

 

NEW QUESTION 128
A manufacturing company is redesigning various component projects that comprise a large customer-facing program. One of the component projects is payment of back-end rebates. There is disagreement between the marketing and sales teams on how much should be rebated.
What are suggested standard measurement criteria for the success of all constituent projects to meet stakeholder expectations''

  • A. Stakeholder engagement plan, risk management plan, and communications management plan
  • B. Needs analysis, feasibility study, and integrated benefits management plan
  • C. Actual cost (AC), planned value (PV) and earned value (EV)
  • D. Cost-benefit analysis ROI and payback period

Answer: D

 

NEW QUESTION 129
In order for an ICT distribution designer to identify the BEST solutions for the client's needs they may have to provide

  • A. Operation and Maintenance manuals
  • B. material lists (e.g., BOM).
  • C. shop drawings
  • D. subcontractors lists

Answer: B

 

NEW QUESTION 130
A program completes all component projects and all identified benefits are being delivered However, the program sponsor is concerned that long-term benefits may not meet organizational performance parameters To ensure the realization of long-term benefits what should the program manager use?

  • A. Benefits transition plan
  • B. Benefits register
  • C. Benefits management plan
  • D. Benefits sustainment plan

Answer: D

 

NEW QUESTION 131
Which type of protection for electrical power stations provide isolation against a rise in potential of station ground and also provide drainage protection against longitudinally-induced voltages?

  • A. Unit-type neutralizing transformers
  • B. Mutual drainage reactors
  • C. Isolating transformers
  • D. 2-winding neutralizing transformers
  • E. Neutralizing transformers

Answer: C

 

NEW QUESTION 132
A program manager for an electronic gaming manufacturer is managing a new virtual reality program. An international trade agreement in the final stages of renegotiation will reduce supply-chain costs and delivery intervals A materials supplier informs the program manager that when this agreement is finalized, it will shorten the products delivery time.
What should the program manager update first?

  • A. Procurement management plan
  • B. Risk register
  • C. Benefits register
  • D. Benefits management plan

Answer: C

 

NEW QUESTION 133
During the last steering committee meeting, a program manager presented the benefits register to the program governance board. Since the intended benefits of the program were realized the program manager was asked to transition the program into operations.
At this stage, what is expected during the post-review session organized by the program manager?

  • A. Benefits register updates
  • B. Earned value (EV) report
  • C. Feedback and lessons learned
  • D. Customer sign-off

Answer: C

 

NEW QUESTION 134
When designing a video communications network, which type of video communication link is two-person videoconferencing?

  • A. PTP unidirectional
  • B. Point-to-multipoint unidirectional
  • C. Point-to-multipoint bidirectional
  • D. PTP bidirectional
  • E. Unidirectional

Answer: A

 

NEW QUESTION 135
Which two of the following roles do an ICT distribution designer use to ensure a timely and cost-effective telecommunications construction project? (Select two options.)

  • A. Verify that the overall physical security design complies with the owner expectations.
  • B. Discuss design concerns with inspectors. AHJs, and other stakeholders.
  • C. Coordinate electrical supply so it is available in advance of the starting of contractor work.
  • D. Assist in the resolution of unforeseen conditions, change orders RFIs and changes to the project's critical path.
  • E. Ensure the construction materials are stored properly and protected from theft.

Answer: D,E

 

NEW QUESTION 136
The transfer of unwanted signals may occur over one path or several paths. What method addresses the mitigation or suppression of unwanted signals?

  • A. The use of unshielded cables
  • B. Bonding and grounding
  • C. Signal coupling
  • D. Mounting heights in racks and cabinets

Answer: B

 

NEW QUESTION 137
What is the air change requirement for a tunnel of 610 m (2000 ft) long with a diameter of 3.4 m (11 ft)?

  • A. Two complete air changes per hour
  • B. Four complete air changes per hour
  • C. Five complete air changes per hour
  • D. One complete air change per hour
  • E. Three complete air changes per hour

Answer: E

 

NEW QUESTION 138
Who prepares the submittals that are reviewed and approved to ensure that the clients design criteria is met in regards to material selection?

  • A. General Contractor
  • B. ICT distribution designer
  • C. Architect. Engineering, Consultant Team
  • D. Client

Answer: A

 

NEW QUESTION 139
A program to implement a new payroll processing system at a healthcare company is nearing completion and is under budget. What should the program manager do next?

  • A. Present additional opportunities to the program sponsor
  • B. Request permission from the program governance board to initiate program closure activities
  • C. Apply the remaining budget to deferred enhancement requests
  • D. Apply the remaining budget to operational activities

Answer: B

 

NEW QUESTION 140
The type of apparatus housed in TRs varies greatly in size, purpose and function. Which two of the following active equipment is included? (Select two options.)

  • A. Environmental controls
  • B. Building system equipment
  • C. Telecommunication's equipment
  • D. Lighting controls
  • E. Cross-connect facilities

Answer: B,C

 

NEW QUESTION 141
In a PON deployment, which active device is installed at the work area?
Wireless access point

  • A. Optical amplifier
  • B. Optical network terminal
  • C. Optical line terminal
  • D. Splitter

Answer: D

 

NEW QUESTION 142
The program manager has a global program with live component projects. The program sponsor wants the management plans, processes/procedures and technology to be uniform across the program. The requirements will create issues and result in increased costs. The program sponsor is new and has imposed these new requirements six months into a three-year program.
What should the program manager do next?

  • A. Discuss the proposed changes with the stakeholders and project managers, and give the program sponsor Die best option
  • B. Accept what the program sponsor requires and implement the changes
  • C. Present the risks and benefits of the changes to the program sponsor
  • D. Respond to the program sponsor if the program sponsor asks about It a second time

Answer: C

 

NEW QUESTION 143
In a program's definition phase a program manager in country A is assigned to expand a restaurant chain into country B.
The program manager creates the program team by identifying the required protect management resources.
Which of the following represents an initial step needed to evaluate available resources that are aligned with me program's needs''

  • A. Completing an assessment of skills and competencies
  • B. Obtaining resource availability information from the functional managers
  • C. Identifying program resource requirements
  • D. Creating a program resource management plan

Answer: C

 

NEW QUESTION 144
An organization must accelerate a product to market. The program manager completes the preliminary program slaps and holds a kick-off meeting Project managers submit their preliminary schedules for review What should the program manager do next?

  • A. Integrate the project schedules into the program schedule and report the revised delivery date to the project managers
  • B. Assign resources lo the schedule and report the revised delivery date to the project managers
  • C. Work with the project managers to refine the project schedules and deliverables to align with the program milestones
  • D. Revise the project schedules to meet the program schedule and communicate to stakeholders

Answer: D

 

NEW QUESTION 145
......