
[Oct 16, 2023] Pass Your E_S4HCON2022 Dumps Free Latest SAP Practice Tests
Get Top-Rated SAP E_S4HCON2022 Exam Dumps Now
NEW QUESTION # 40
What is the different between the benchmaking and the repetition option of the Database Migration Option (DMO) of SUM?
- A. The benchmaking option allows you to repeat the uptime migration
- B. The repetition option allows you to run the migration without a shadow system
- C. The benchmaking option allows you to migration a specified set of tables
- D. The repetition option allows you to repeat the complete migration
Answer: C
NEW QUESTION # 41
What can you achieve by setting the SUM parameter "migration_only" to 1 in parameter file SAPup_add.par?
Please choose the correct answer.
Response:
- A. An upgrade of the software components is performed, without changing the database type.
- B. A change of the database type is performed, without changing the software components.
- C. An SAP S/4HANA conversion is performed, without adapting the customer data.
- D. A migration of the SAP system to a new hardware is performed, without performing an SAP S/4HANA conversion.
Answer: B
NEW QUESTION # 42
During a DMO procedure with SUM, after which phase is the repository first available on the target database?
Please choose the correct answer.
Response:
- A. ParaUel distribution (PARDIST_SHD)
- B. Uptime migration (EU_CLONE_MIG_UT_RUN)
- C. Downtime migration (EU_CLONE_MIG_DT_RUN)
- D. Shadow repository creation (EU_IMPORT*)
Answer: B
NEW QUESTION # 43
In which case can you use near-Zero Downtime Maintenance (nZDM)? Note: There are 2 correct answers to this question.
- A. When upgrading an SAP S/4HANA Server system
- B. When performing an SAP S/4HANA conversion with DMO
- C. When upgrading an SAP ECC system with DMO
- D. When performing an SAP S/4HANA conversion without u DMO
Answer: A,C
NEW QUESTION # 44
SUM was registered at the SAP Host Agent. Based on which information does the SAP Host Agent determine the path to the SUM directory.
- A. The path is taken from the URL entered in the browser to start SUM
- B. The path was stored in file host_profile during registration
- C. The path was stored in file sumabap conf during registration
- D. The path was stored to the environment of user <sid>adm during registration
Answer: C
NEW QUESTION # 45
Unicode migration ECC on MaxDB to HANA in scale out what should we consider.
- A. DMO can only be run with systems NW740 or NW731
- B. A
- C. Target DB size will increase temporarily
Answer: A,C
NEW QUESTION # 46
What are the benefits of using the benchmarking option of the DMO for SUM? Note There are 2 correct answers to this question
- A. You can verify that the content of the download directory matches the stack XML file.
- B. You can record the modification adjustment during migration and use the transports in the next runs.
- C. You can find the optimal number of parallel H3load processes by monitoring host performance
- D. You can obtain migration duration tiles from a previous benchmark run that can be used to optimize the next runs
Answer: C,D
NEW QUESTION # 47
You want to execute a Unicode Conversion only. Which approach do you need to follow?
Please choose the correct answer.
Response:
- A. SWPM using the Load procedure
- B. SUM with DMO
- C. SWPM using the Backup / Restore procedure
- D. SUM without DMO
Answer: A
NEW QUESTION # 48
Which preparational steps must be performed for an SAP S/4HANA conversion?
There are 2 correct answers to this question.
Response:
- A. Install add-on SAP Gateway 7.50
- B. Uninstall Fiori apps not released for SAP_UI 7.50
- C. Delete client 066 (Early Watch Client)
- D. Uninstall industry extensions not supported by SAP S/4HANA
Answer: B,C
NEW QUESTION # 49
You are running an SAP ECC system with SAP_BASIS 740, non-Unicode on SAP MaxDB. Which of the following are possible paths to perform an SAP S/4HANA conversion? Note: There are 3 correct answers to this question.
- A. Unicode conversion SAP S/4HANA conversion without database migration Database migration
- B. Unicode conversion Database migration SAP S/4HANA conversion without database migration
- C. Unicode conversion SAP S/4HANA conversion including database migration
- D. SAP S/4HANA conversion including database migration and Unicode conversion
- E. Unicode conversion Upgrade to SAP ECC with SAP_BASIS 750 including database migrationSAP S/4HANA conversion without database migration
Answer: B,C,E
NEW QUESTION # 50
You are executing a standard SUM procedure to update an SAP system using main configuration mode "Standard". When will the shadow system be stopped for the last time?
Please choose the correct answer.
Response:
- A. Early in the downtime
- B. As part of the cleanup process
- C. At the end of the downtime
- D. Before the downtime starts
Answer: D
NEW QUESTION # 51
During the upgrade of your development system, you run into the adjustment of non-dictionary objects handled by transaction SPAU There you find programs that are shown in status "automatic adjustment (green traffic tight). What will happen with these programs when you continue with your upgrade without performing any other actions inside your SAP system?
- A. Before continuing with the next phase SUM asks for a modification adjustment transport
- B. SUM continues with the next phase and your modifications are kept as In the start release
- C. SUM continues with the next phase and your modifications are lost
- D. SUM refuses to continue unless you have marked a transport request as modification adjustment transport
Answer: B
NEW QUESTION # 52
You have chosen the "Advanced" option during the main configuration of the SUM tool. Which steps take place via the shadow instance?
There are 2 correct answers to this question.
Response:
- A. Conversion of application tables (PARCONVJJPG)
- B. Modification adjustment (SPDD)
- C. Activation of dictionary objects (ACT_UPG)
- D. Switch to new repository (EU_SWITCH)
Answer: B,C
NEW QUESTION # 53
What do you need to consider when performing the SI checks for an SAP S/4HANA conversion? There are 2 correct answers to this question.
- A. You need an SAP system based on AS ABAP 7.50 or above for the SI check framework.
- B. Depending on the SAP S/4HANA version, there are different SI check frameworks.
- C. You need to build up a SI check framework by applying SAP notes.
- D. The SI checks are executed in the development system and the results are transported into the subsequent systems.
Answer: B,C
NEW QUESTION # 54
You are performing an SAP S/4HANA conversion. You are in the BIND_PATCH phase of the Configuration roadmap step. For some software components, you find entries in the Calculated level column. What does the Calculated level indicate for those software components?
- A. The SAP support packages that will be bound to the conversion
- B. The SAP support packages of the support package stack, calculated by the maintenance planner
- C. The SAP support packages contained in the upgrade media, calculated by the maintenance planner
- D. The SAP support packages in the download directory that are newer than the selected support package stack
Answer: D
NEW QUESTION # 55
You are using the maintenance planner to calculate the required software components for your SAP S4HANA conversion. What do you need to know regarding SUM?
- A. AA
- B. As soon as the next SP level of SUM is available, the current version of SUM passes into "patch on request mode" immediately.
Answer: B
NEW QUESTION # 56
In which part of an upgrade does SUM allow you to generate ABAP loads (SGEN)?
There are 2 correct answers to this question.
- A. During SPDD
- B. During uptime
- C. Post-downtime
- D. During downtime
Answer: B,C
NEW QUESTION # 57
How does SUM recognize modification adjustment transports from predecessor systems?
Please choose the correct answer.
Response:
- A. By searching for transport requests in the file umodauto.Ist
- B. By searching for transport requests named <SID>K0<number>
- C. By searching for transport requests in DIR_TRANS, subdirectory "transport"
- D. By searching for transport requests that are assigned to the project SAP_ADJUST
Answer: A
NEW QUESTION # 58
Which of the following SUM activities require a stack XML file calculated by the maintenance planner? Note: There are 3 correct answers to this question.
- A. Benchmark tool
- B. Prerequisite check
- C. SAP S/4HANA conversion without DMO
- D. SAP S/4HANA conversion including DMO
- E. DMO without system update
Answer: B,C,D
NEW QUESTION # 59
What do you need to know about the SAP ERP Upgrade and Update Guide?
There are 2 correct answers to this question.
Response:
- A. It contains a section "free space requirements"
- B. It is a database-specific document
- C. It contains a troubleshooting section
- D. It is target release specific
Answer: A,D
NEW QUESTION # 60
You are performing an upgrade with SUM using DMO to an AS ABAP 7.50 based SAP system. You entered a specific number of R3Ioad processes during Roadmap step "Extraction".
Where can you change this during the migration via the Utilities option of the SUM UI?
There are 2 correct answers to this question
Response:
- A. In DMO Migration Preparation
- B. In Process Control Center
- C. In SUM Phaselist
- D. In SUM Parameters
Answer: B,D
NEW QUESTION # 61
You are performing an inplace SAP S/4HANA conversion including DMO. What is the latest point in time when you can reset the procedure without losing data?
- A. The start of the business downtime
- B. The end of the database migration
- C. The start of the Execution roadmap step
- D. The end of the business downtime
Answer: D
NEW QUESTION # 62
ICNV initialization does 3
- A. AA
- B. Build index on flag column
- C. Creation of views
- D. Creation of flag
Answer: B,C,D
NEW QUESTION # 63
You want to perform an SAP S/4HANA conversion using SUM with DMO. Which steps run before the beginning of the technical downtime, independent of your SUM configuration?
There are 3 correct answers to this question.
Response:
- A. Generation of the new ABAP loads in phase RUN_SGEN_GENER8
- B. Import of dictionary objects from the download directory in phase DDIC_UPG
- C. Activation of dictionary objects in phase ACT_UPG
- D. Creation of application tables in the SAP HANA database in phase EU_CLONE_MIG_DT_CREATE
- E. Import of upgrade and language data from the download directory in phase TABIM UPG
Answer: B,C,E
NEW QUESTION # 64
......
Passing Key To Getting E_S4HCON2022 Certified Exam Engine PDF: https://www.lead1pass.com/SAP/E_S4HCON2022-practice-exam-dumps.html
E_S4HCON2022 Exam Dumps Pass with Updated Tests Dumps: https://drive.google.com/open?id=1xRpikHx_PurluYvIELmgRKE6jyelL5Qp