NEW QUESTION # 48
Typical gases used in new pipeline construction are?

  • A. Part of quality management focussed on setting quality objectives and specifying necessary operational processes, and resources to achieve the quality objectives(ISO 9000 3.3.5)
  • B. Set of interrelated activities that use inputs to deliver an intended result(ISO 9000 3.4.1)
  • C. Oxygen and acetylene (welding/cutting operations)Nitrogen (purging)LPG (heating/drying)Compressed air (pneumatic tools, grit blasting, tire inflation, painting)
  • D. Within 2 feet of the existing facilities or the distance mandated by state law which ever is greater(INGAA CROSSING guide 11 K)

Answer: C


NEW QUESTION # 49
Define Excavation Tolerance Zone

  • A. Is the singular point of contact identified within the company of the crossing company and the owner who has the responsibility to communicate about the safely managed crossing. There will be a cross and Company designated contact and an owner designated contact.
  • B. Is the area where the edge of the disturbance is within 25 feet of the centreline of the existing facilities.
  • C. Is the area in which soil must be removed by non-mechanical means such as (hand digging, pot-holing, or hydro-Vac) rather than mechanical means. It is an area within 2 feet of the existing facilities or the distance mandated by state law where applicable, whichever is greater.
  • D. Is the vertical separation between the existing pipeline and facilities and where the new pipeline is being installed. The recommended crossing clearance distance between the new pipeline and the existing facilities is two feet (24"). The minimum distance is one foot (12"). The new pipeline should be installed at a level depth across the ROW, if practicable.

Answer: D


NEW QUESTION # 50
What section of 49 CFR 192 covers miter joints?

  • A. 202.233
  • B. 1 & 2
  • C. 96.233
  • D. 192.233

Answer: D


NEW QUESTION # 51
What is an example of a sustained load:
-total volume of pipe including components, etc
-total flow of pipe including components, etc
-weight of the pipe including components, etc

  • A. weight of the pipe including components
  • B. flotation
  • C. 2 / 1/4
  • D. for the purpose of listing materials category

Answer: A


NEW QUESTION # 52
Cohesive soil with an unconfined compressive strength of .5 tsf or less

  • A. A
  • B. C
  • C. boundaries of sensitive resource areas, water bodies, wetlands or areas with special requirements.
  • D. Subpart G 192.327

Answer: B


NEW QUESTION # 53
Hearing protection during a hydro test requirement state that the protection must be adequate to reduce the noise to at least below ____ decibels.

  • A. 0
  • B. 1
  • C. 2
  • D. 3

Answer: A


NEW QUESTION # 54
Process of providing a design by testing to demonstrate conformity of the product to design requirements.

  • A. Verification
  • B. Design changes
  • C. Design validation
  • D. Design output

Answer: C


NEW QUESTION # 55
EPA - Phase for containment counter measures cleanup and disposal.

  • A. Subpart G 192.315
  • B. Phase III
  • C. 10% / 15% 192.243
  • D. Grading

Answer: D


NEW QUESTION # 56
The following should be included in digital RT procedures except for?
The image, collection, processing....
The system power source
The Total magnification used for viewing
The amount of geometric magnification used

  • A. The image, collection, processing....
  • B. The system power source
  • C. Clearing
  • D. Coating condition of the pipe

Answer: D


NEW QUESTION # 57
The total amount of residual air in the hydrostatic test section should not exceed _______%
1
2
4
5

  • A. 10% of volume
  • B. 100%192.243
  • C. 5% of volume
  • D. 30% of volume

Answer: C


NEW QUESTION # 58
Per INGAA guidelines, what is the excavation tolerance zone distance?

  • A. 0
  • B. 1
  • C. 2
  • D. 3

Answer: A


NEW QUESTION # 59
The company installing a utility will ID areas within _______ ft of existing facilities where blasting will take place

  • A. 0
  • B. 1
  • C. 2
  • D. 3

Answer: C


NEW QUESTION # 60
Soil that remains in clumps

  • A. Cohesive
  • B. Granular
  • C. Cohesionless
  • D. Adhesive

Answer: A


NEW QUESTION # 61
Define SPCC

  • A. Operator qualification
  • B. Resource conservative in recovery act
  • C. National pollutant discharge elimination systems
  • D. Spill prevention, control, and containment

Answer: D


NEW QUESTION # 62
CERCLA purpose

  • A. To remedy threats to human health and the environment from unexpected releases and historical mistakes in hazardous waste management
  • B. Noise level exceeds 85 dba over an 8 hour period. INGAA states during pressure testing to keep under 80 dba,s
  • C. Regulation Transportation of Natural and Other Gas by Pipeline
  • D. Area within 24" of facilities or the distance mandated by state law, whichever is greater. NOTE: CGA & INGAA says 18".

Answer: C


NEW QUESTION # 63
For type ______, the Top width = 1.5 x depth + bottom width

  • A. Site -specific
  • B. A
  • C. Is
  • D. C

Answer: C


NEW QUESTION # 64
Trenches _____ deep or greater require a protective system which can be sloping, benching, trench boxes

  • A. 4, 19.5% - 23.5%
  • B. 10,
  • C. 5,
  • D. 100,

Answer: B


NEW QUESTION # 65
According the FERC, a schedule identifying when trenching or blasting will occur within each water body greater than ______ wide must be filed with the Secretary prior to the beginning of construction (Exceptions: Project falls under the automatic authorization provisions)

  • A. 0
  • B. 4 ft
  • C. 1
  • D. 1 & 2

Answer: D