NEW QUESTION # 33
What is the different between the benchmaking and the repetition option of the Database Migration Option (DMO) of SUM?

  • A. The repetition option allows you to repeat the complete migration
  • B. The repetition option allows you to run the migration without a shadow system
  • C. The benchmaking option allows you to migration a specified set of tables
  • D. The benchmaking option allows you to repeat the uptime migration

Answer: C


NEW QUESTION # 34
You want to perform custom code check via ABAP test cockpit in preparation of your SAP S/4HANA conversion? What kind of SAP System can you use to generate the custom code migration worklist?

  • A. A Standalone SAP system with ABAP 7.51 or above
  • B. An SAP S4HANA 1709 sandbox system
  • C. AA

Answer: A,B


NEW QUESTION # 35
You are planning to upgrade your SAP ECC 6.07 system running on a single codepage (SCP) to SAP ECC 6.08. What is the recommended option to perform this upgrade?
Please choose the correct answer.
Response:

  • A. Combine the upgrade and the Unicode conversion using the Combined Upgrade &Unicode Conversion (CU &UC) procedure.
  • B. Perform the upgrade to SAP ECC 6.08 before the Unicode conversion.
  • C. Perform the Unicode conversion before the upgrade to SAP ECC 6.08.
  • D. Combine the upgrade and the Unicode conversion using the Twin Upgrade &Unicode Conversion (TU &UC) procedure.

Answer: C


NEW QUESTION # 36
In which part of an upgrade does SUM allow you to generate ABAP loads (SGEN)?
There are 2 correct answers to this question.

  • A. During SPDD
  • B. During downtime
  • C. During uptime
  • D. Post-downtime

Answer: C,D


NEW QUESTION # 37
During the configuration of the DMO for SUM, how does the tool behave if option "Do not compare table contents" is selected regarding table comparison?
Please choose the correct answer.
Response:

  • A. It does NOT perform any table comparison.
  • B. It performs a comparison on all tables using row counts.
  • C. It performs a comparison on selected tables using check sum.
  • D. It performs a comparison of all tables using check sum.

Answer: B


NEW QUESTION # 38
You are running an SAP ECC system.
For which of the following activities does SUM allow you to use the near-Zero Downtime Maintenance (nZDM) capabilities?
Note There are 3 correct answers to this question

  • A. Perform an SAP S/4 HANA conversion including DMO
  • B. Upgrade the SAP system
  • C. Use DMO for SUM
  • D. Perform an SAP S/4 HANA conversion without DMO
  • E. Apply SAP support packages

Answer: B,C,E


NEW QUESTION # 39
You are planning to use DMO of SUM to perform an "inplace-migration" to SAP HANA. What do you need to consider? Note: there are 2 correct answers to this question.

  • A. The source system is non-Unicode and the target database is a scale-out system.
  • B. Unicode conversion is part of DMO only in case of target version AS ABAP 7.40 or 7.31.
  • C. The target database size increases temporarily because of the Shadow Repository.
  • D. Network capacity between exporting and importing R3load processes must be.
  • E. SAP HANA Landscape Reorganization required a manual step to edit a file.

Answer: B,E


NEW QUESTION # 40
You are using DMO of SUM. You defined 40 parallel R3load processes during uptime and 80 parallel R3load processes during downtime. You have chosen table count verification, but not table contents comparison.
Phase EU_CLONE_MIG_DT_RUN is running. In the Charts Control Center, you can see 40 process buckets being executed in parallel.
Why are 40 Process Buckets executed in parallel?

  • A. Without table contents comparison, only 40 R3load processes are being started.
  • B. There are 40 Reload processes used for copying and 40 Reload processes for table count verification.
  • C. SUM is still running in uptime; the 40 defined Reload processes are considered.
  • D. These are 40 pairs of Reload processes, so there are 80 R3load processes running.

Answer: A


NEW QUESTION # 41
What can you achieve by setting the SUM parameter "migration_only" to 1 in parameter file SAPup_add.par?
Please choose the correct answer.
Response:

  • A. A change of the database type is performed, without changing the software components.
  • B. An upgrade of the software components is performed, without changing the database type.
  • C. A migration of the SAP system to a new hardware is performed, without performing an SAP S/4HANA conversion.
  • D. An SAP S/4HANA conversion is performed, without adapting the customer data.

Answer: A


NEW QUESTION # 42
You are performing an SAP S/4HANA conversion. When does the silent data migration (SDM) take place?

  • A. During the Execution roadmap step
  • B. After SUM has ended
  • C. During the SUM technical downtime
  • D. Before the start of the SUM technical downtime

Answer: C


NEW QUESTION # 43
What do you do to prepare the database migration option of a SUM procedure?
There are 3 correct answers
Response:

  • A. Move the SAPM update archive into the download folder
  • B. Extract the SAP HANA client installation archive
  • C. Move the R3trans update archive into the download folder
  • D. Move the stack.xml update file into the download folder
  • E. Extract the SAP HANA database installation archive

Answer: A,B,D


NEW QUESTION # 44
What do you need to know about the SAP S/4HANA Conversion Guide? Note: There are 2 correct answers to this question.

  • A. It explains the database migration option (DMO) of SUM.
  • B. It explains where to find information about the custom code analysis.
  • C. It is a database-specific document.
  • D. It contains a section about the simplification item (SI) checks.

Answer: B,D


NEW QUESTION # 45
You are executing a standard SUM procedure to update an SAP system using main configuration mode
"Standard". When will the shadow system be stopped for the last time?
Please choose the correct answer.
Response:

  • A. At the end of the downtime
  • B. Early in the downtime
  • C. As part of the cleanup process
  • D. Before the downtime starts

Answer: D


NEW QUESTION # 46
You are starting an SAP S/4HANA Conversion. The scenario strategy Downtime Optimized Conversion (DoC) is NOT selectable.What could be the reason?

  • A. The SAP S/4HANA Conversion includes a DMO.
  • B. The SAP S/4HANA Conversion is without DMO.
  • C. The source database is not supported
  • D. The start release is too old for DOC.

Answer: C


NEW QUESTION # 47
You are preparing for a standard SAP S/4HANA conversion from SAP ECC on Windows with SAP MaxDB to SAP S/4HAN. You are performing the corresponding maintenance transaction with the Maintenance Planner. Which kernels do you need to select for the SAP S/4HANA conversion?
There are 2 correct answers to this question.

  • A. Kernel for target release, Windows, SAP HANA
  • B. Kernel for source release, Windows, SAP MaxDB
  • C. Kernel for target release, Windows, SAP MaxDB
  • D. Kernel for target release, Linux, SAP HANA

Answer: A,B


NEW QUESTION # 48
In ICNV. How database operations synchronized between the source and the target table?

  • A. Deletes are directly executed in the target table by delete trigger.
  • B. AA

Answer: A


NEW QUESTION # 49
You are performing an SAP S/4HANA conversion with DMO. You are using the downtime-optimized data conversion (DoC). Which steps can partially be moved to uptime processing? Note: There are 2 correct answers to this question.

  • A. Main import
  • B. Software update
  • C. Conversion
  • D. Migration

Answer: C,D


NEW QUESTION # 50
You are performing an SAP S/4HANA conversion for your production system. This conversion requires that certain business functions are switched on.
Following SAP recommendations, how will you achieve this?
There are 2 correct answers to this question.
Response:

  • A. Specify the business functions that need to be switched on during the prepare part of SUM.
  • B. Activate the required business functions manually in the production system.
  • C. During conversion, SUM delivers some business functions already activated.
  • D. Import a transport request from the development system that contains the recording of the activation.

Answer: C,D


NEW QUESTION # 51
You performed a custom code check for an SAP S/4HANA conversion. In which transactions can you review the results?
There are 2 correct answers to this question.
Response:

  • A. SAT (Runtime Analysis)
  • B. SYCM (Simplification Database Content)
  • C. SE80 (Object Navigator)
  • D. ATC (ABAP Test Cockpit)

Answer: C,D


NEW QUESTION # 52
During a SUM run you want to check if the phase SHADOW_IMPORT_INC is still running properly. Where can you find information about this?
There are 2 correct answers to this question.
Response:

  • A. Check for running R31oad processes on the host of the primary application server
  • B. Check for the latest log files in the SUM directory, subdirectory ABAP, subdirectory tmp
  • C. Check for running batch jobs in the shadow system via Job Overview (SM37)
  • D. Check for running R3trans processes on the host of the primary application server

Answer: B,D


NEW QUESTION # 53
You are performing an upgrade of an SAP ECC development system with SUM. What is the earliest point when the upgrade is considered complete and you can allow all dialog users to log on to the system?
Please choose the correct answer.
Response:

  • A. After the SUM roadmap step "Execution" is finished and before "Postprocessing"
  • B. During the SUM roadmap step "Postprocessing", in parallel with post procedure steps
  • C. After the SUM roadmap step "Postprocessing" and post procedure steps are finished
  • D. During the SUM roadmap step "Postprocessing", after the post procedure steps are complete

Answer: D


NEW QUESTION # 54
Regarding an SAP Upgrade, What does the major SAP Note for the version of SUM you are using usually contain?

  • A. The link to different patch levels to SUM
  • B. An overview about possible upgrade paths
  • C. AA
  • D. The corrections to the SUM Guide

Answer: A,B,D


NEW QUESTION # 55
Which circumstances will allow SUM to run without the creation of a shadow system?
Please choose the correct answer.
Response:

  • A. Using the database migration option (DMO) for SUM
  • B. Using the main configuration option "Single System" when installing an Add-On
  • C. Using the main configuration option "Standard" when applying SAP Support Packages
  • D. Using the main configuration option "Single System" in case of an upgrade.

Answer: B


NEW QUESTION # 56
You want to use the Custom Code Migration Worklist via Remote Code analysis using the ABAP Test Cockpit (ATC). How can you get the latest content of the simplification database? Please choose the correct answer.

  • A. Apply the corresponding SAP note via SAP Note Assistant
  • B. Download it from SAP Support Portal
  • C. Configure it within transaction ATC
  • D. Generate it by analyzing the specific custom code via RFC

Answer: B


NEW QUESTION # 57
You want to use the downtime-optimized data conversion for your SAP S/4HANA conversion. What is the main difference from a standard SAP S/4HANA conversion?
Please choose the correct answer.
Response:

  • A. The repository is migrated in uptime
  • B. Dedicated application tables are migrated in uptime
  • C. An additional temporary database is used during uptime
  • D. TABIMJJPG is executed in uptime

Answer: B


NEW QUESTION # 58
......

Cover E-S4HCON2023 Exam Questions Make Sure You 100% Pass: https://www.lead1pass.com/SAP/E-S4HCON2023-practice-exam-dumps.html