NEW QUESTION # 49
You use the Finite Scheduling - with Reverse planning strategy and want to allow scheduling in the past.
How can you parameterize this in the strategy profile?
- A. Specify a negative offset time
- B. Specify a negative planning horizon
- C. Specify a negative opening period
- D. Specify a negative PP/DS horizon
Answer: A
NEW QUESTION # 50
What does forecasting in the demand planning cycle include?
Note: There are 3 correct answers to this question.
- A. Past sales order quantities
- B. One-off events
- C. Market intelligence
- D. Past production planning quantities
- E. Past quotation quantities
Answer: A,B,C
NEW QUESTION # 51
When can you maintain the batch characteristic values in SAP S/4HANA?
Note: There are 2 correct answers to this question.
- A. When you release the batch
- B. When you post the goods receipt
- C. When you record inspection results
- D. When you execute batch determination
Answer: B,C
NEW QUESTION # 52
What are prerequisites for a production version to be selected for a production order? Note: There are 3 correct answers to this question.
- A. The basic start date of the order must lie within the validity period of the production version.
- B. The production quantity must lie within the lot-size range of the production version.
- C. The basic end date of the order must lie within the validity period of the production version.
- D. The production version must NOT be deleted.
- E. The production quantity must only lie within the lot-size range of the routing in the production version.
Answer: A,B,E
NEW QUESTION # 53
What data can you maintain in the items detail screen of a bill of material (BOM)?
Note: There are 2 correct answers to this question.
- A. Alternative item group
- B. Lot size
- C. Co-product
- D. Change number
Answer: A,C
NEW QUESTION # 54
What are some benefits of planning with planned independent requirements for finished materials?
Note: There are 2 correct answers to this question.
- A. The delivery time is reduced.
- B. You have the option to use make-to-order production.
- C. Manufacturing time for final assembly is reduced.
- D. You have the option to use forecast planning.
Answer: B,D
NEW QUESTION # 55
Your project team decides to use a make-to-order planning strategy for a strategic material in discrete manufacturing. What are the impacts of this decision?
Note: There are 3 correct answers to this question.
- A. Production and procurement costs are managed on the sales order item level.
- B. Planned orders are created in MRP with reference to sales orders.
- C. Storage location MRP areas are required to manage sales-order-specific stock.
- D. Sales orders have to be ATP-confirmed (available-to-promise) to be saved.
- E. Net requirements calculation is carried out for every sales order individually.
Answer: A,B,E
NEW QUESTION # 56
How are dependent requirements for assemblies created?
Note: There are 2 correct answers to this question.
- A. They are created on the assembly level during the planning run.
- B. They are created together with the independent requirement for the finished product.
- C. They are created with exact times in Advanced Planning.
- D. They are only created for multilevel bill of material (BOM) structures.
Answer: A,C
NEW QUESTION # 57
What are some options for creating a production order?
Note: There are 2 correct answers to this question.
- A. By converting a purchase requisition
- B. By partially converting a planned order
- C. By setting a Kanban container to full
- D. By setting a Kanban container to empty
Answer: B,D
NEW QUESTION # 58
Your company manufactures materials whose characteristics differ for each manufacturing process.
Which application do you choose in SAP S/4HANA to track and use this information in all areas of logistics?
- A. Engineering change management
- B. Quality management
- C. Process order management
- D. Batch management
Answer: D
NEW QUESTION # 59
What is the focus of repetitive manufacturing?
- A. Low volume production
- B. Detailed tracking of production orders
- C. Period and quantity-oriented production
- D. Production of lot size one
Answer: C
NEW QUESTION # 60
What is the purpose of the pull list in material staging?
- A. To control the flow of material from the supplier to the production storage location
- B. To control the flow of material from the central storage location to the production storage location
- C. To control the flow of material from the production storage location to the central storage location
- D. To control the flow of material from the supplier to the central storage location
Answer: B
NEW QUESTION # 61
Which options do you have to exclude Advanced Planning materials from the standard MRP run in SAP S/4HANA?
Note: There are 2 correct answers to this question.
- A. Use the material number for selection
- B. Use a different MRP planner for PP/DS materials
- C. Use a propagation range
- D. Use the special MRP type XO
Answer: B,D
NEW QUESTION # 62
Which of the following would you recommend as SAP's strategic Sales and Operations planning tool?
- A. Advanced Planning
- B. Standard Sales and Operations Planning
- C. Integrated Business Planning
- D. Flexible Planning
Answer: C
NEW QUESTION # 63
Which options do you have to post goods receipt for a process order?
Note: There are 2 correct answers to this question.
- A. You post the entire manufactured quantity to one batch if the product quality changes during production.
- B. You post the entire manufactured quantity to multiple batches if the product quality remains consistent during production.
- C. You post the entire manufactured quantity to multiple batches if the product quality changes during production.
- D. You post the entire manufactured quantity to one batch if the product quality remains consistent during production.
Answer: C,D
NEW QUESTION # 64
How can a material availability check be triggered automatically for a production order?
Note: There are 2 correct answers to this question.
- A. By capacity planning
- B. By order confirmation
- C. By order release
- D. By mass processing
Answer: C,D
NEW QUESTION # 65
What are some options for creating production orders without using trigger points?
Note: There are 2 correct answers to this question.
- A. In make-to-stock production, confirmation of yield for sub-assembly triggers the creation of a production order
- B. In make-to-stock production, you can manually create production orders
- C. In assembly production, confirmation of scrap triggers the creation of a production order
- D. In assembly production, a sales order triggers the creation of a production order
Answer: B,D
NEW QUESTION # 66
Which chart types does the tabular planning table for capacity planning provide in SAP S/4HANA Cloud Private Edition?
Note: There are 2 correct answers to this question.
- A. Order (dispatched) chart
- B. Order (pool) chart
- C. Work center capacities chart
- D. Capacity requirements chart
Answer: C,D
NEW QUESTION # 67
......
Updated SAP C_P2W22_2504 Dumps – PDF & Online Engine: https://www.lead1pass.com/SAP/C_P2W22_2504-practice-exam-dumps.html