NEW QUESTION # 12
You have selected "Standard" as scenario strategy in the SUM tool.
Which steps take place via the shaddow instance? Note: There are 2 correct answers to this question.

  • A. Conversion of application tables (PARCONV_UPG)
  • B. Modification adjustment (SPDD)
  • C. Modification adjustment (SPAU)
  • D. Activation of dictionary objects (ACT_UPG)

Answer: B,D


NEW QUESTION # 13
What is the main purpose of perforrming benchmark runs for an SAP S/4HANA conversiion?

  • A. To optimize the migration
  • B. To optimize the conversion
  • C. To optimize the activation
  • D. To optimize the main import

Answer: A


NEW QUESTION # 14
During a SUM run, you want to check if the PARCONV_UPG phase is still running propeerty. Where can you find information about thiss? Note: There are 2 correct answers to this question.

  • A. Check for running R3load processes on the host where SUM is running
  • B. Check the latest log files in the SUM directory, subdirectory abap, subdirectoryy tmp.
  • C. Check the running batch job via Job Overview (SM37).
  • D. Check for running R3trans processes on the host where SUM is running

Answer: B,C


NEW QUESTION # 15
You performed a custom code checck for an SAP S/4HANA conversion.
In which transactions can you review the results? Note: There are 2 correct answers to this question.

  • A. SAT(Runtime Analysis)
  • B. SYCM (Simplification Database Content)
  • C. ATC (ABAP Test Cockpit)
  • D. SE80 (Object Navigator)

Answer: C,D


NEW QUESTION # 16
You are performing an inplace SAP S/4HANA conversion including DMO.
What is the latest point in time wheen you can reset the procedure without losing businness data?

  • A. The start of the business doowntime
  • B. The start of the Execution roadmap step
  • C. The end of the database miigration
  • D. The end of the business downtime

Answer: D


NEW QUESTION # 17
SUM was registered at the SAP Host Agent.
Where does the SAP Host Agent find the path to the SUM directory?

  • A. The path was stored in file sumabap.conf during registration.
  • B. The path was stored in file host profile during registration.
  • C. The path is taken from the URL entered in the browser to start SUM.
  • D. The path was stored to the environment of user <sid>adm during registration.

Answer: A


NEW QUESTION # 18
You are performing an SAP S/4HANA conversion.
When does the silent data migration (SDM) take place using the SUM defaults?

  • A. Before the start of the SUM technical downtime
  • B. After SUM has ended
  • C. During the Postprocessing roadmap step
  • D. During the Preprocessing rooadmap step

Answer: B


NEW QUESTION # 19
Which of the following SUM activitiies require a stack XML file calculated by the mainteenance planner? Note: There are 3 correct answers to this question.

  • A. SAP S/4HANA conversion inncluding DMO
  • B. DMO without system update
  • C. Prerequisite check
  • D. Benchmark tool
  • E. SAP S/4HANA conversion without DMO

Answer: A,C,E


NEW QUESTION # 20
You are planning an SAP S/4HANA conversion.
Which conversion-specific tasks muust be performed during the preparation phase?

  • A. Perform the migration of data to the new data structure.
  • B. Check the compatibility of custom code with SAP S/4HANA.
  • C. Run the database migrationn to the SAP HANA database.
  • D. Solve problems from the si mplification item (SI) checks.

Answer: B


NEW QUESTION # 21
You are performing an SAP S/4HANA conversion with DMO. You entered a specific nummber of R3load processes during the Extraction Roaadmap step.
Where can you change this during the migration via the Utilities option of the SUM UI?? Note: There are 2 correct answers to this questiion.

  • A. In Process Control Center
  • B. In DMO Migration Preparattion
  • C. In SUM Parameters
  • D. In SUM Analysis

Answer: A,C


NEW QUESTION # 22
Which steps should be performed during the adjustment of dictionary objects (SPDD) in the development system before SUM continues? Note: There are 2 correct answers to this question.

  • A. Manually activate the adjussted dictionary objects.
  • B. Create new versions of the objects you need to adjust.
  • C. Assign the transport requesst as a modification adjustment transport.
  • D. Release the transport request containing the modification adjustment.

Answer: B,C


NEW QUESTION # 23
What SAP systems can you use for the ABAP Test Cockpit (ATC) to perform the custom code analysis for an SAP S/4HANA conversion? Note: There are 2 correct answers to this question.

  • A. SAP ECC system from SAP ERP 6.0 EHP 8
  • B. SAP S/4HANA Server 2022
  • C. Standalone AS ABAP with SAP BASIS 752
  • D. SAP Solution Manager 7.2

Answer: B,C


NEW QUESTION # 24
Which of the following are valid options to check the progress of an inplace SUM DMO run? Note:
There are 2 correct answers to this question.

  • A. Check logs for jobs starting with RSUPG SGEN in the SAP system.
  • B. Check the dump size of the database export in the SUM directory, subdirectoryy abap, subdirectory load.
  • C. Check the log files written in the SUM directory, subdirectory abap, subdirectory log
  • D. Check the Charts Control Ceenter in the SUM UL

Answer: C,D


NEW QUESTION # 25
What is the benefit of using the UPGANAXML file from a previous SUM run?

  • A. To repeat specific phases during the SUM run
  • B. To make the progress information within SUM UI more accurate
  • C. To skip selected phases durring the SUM run
  • D. To auto-fill specific fields onn selected screens on the SUM UI

Answer: B


NEW QUESTION # 26
You are performing an SAP S/4HANA conversion, scenario strategy Standard, with DMOO as an inplace migration. How does SUM transfer the data from the source database to the target database during the migration?

  • A. Using R3load and file transffer
  • B. Using R3load and memory pipes
  • C. Using R3load and network socket connection
  • D. Using work processes and network socket connection

Answer: B


NEW QUESTION # 27
You are performing an SAP S/4HANA conversion with the migration repetition option. After which phase does SUM stop to enable a teest cycle?

  • A. EU IMPORT ALL
  • B. EU_CLONE MIG_DT_CREATTE
  • C. EU_CLONE MIG SOT RUN
  • D. EU CLONE MIG_DT_RUN

Answer: D


NEW QUESTION # 28
......